Oil Heating Facility Flush & Purge Operation

Project Date
Present

View of the heating terminal from the top of a liquid storage tank

Hydra deployed and maintained multiple diaphragm pumps on site

Hydra coordinated over 12 frac tanks for F&P operations

Project Highlights
An onshore oil heating facility that processes crude and natural gas required decommissioning. The company awarded Hydra Offshore Construction the project in order to remove contaminants from all vessels and piping.

 

Project Scope of Work
Hydra was contracted to flush and purge all vessels, tanks and process piping at the onshore oil heating facility. The project scope included provisions for all personnel and equipment required for the safe and efficient execution of all flush and purge activities conducted at the site including assistance of pigging operations to an offshore pipeline as well as pipe cutting.

 

Challenges
The challenges involved entry into confined spaces with limited accessibility as well as preventing environmental leaks and spills. Special precautions were taken due to the hazardous environment caused by Lower Explosive Limit (LEL) gases, Naturally Occurring Radioactive Material (NORM) and Hydrogen Sulfide (H2S) gas releases and exposure to other high-pressure liquids and gases.

 

Why Hydra
Recognized as one of the leading oil and gas decommissioning service companies in the industry, Hydra was committed to quality, safety and customer service throughout the duration of the project. The key to success is Hydra’s commitment to working with clients and partners to find optimal solutions in the demanding oil and gas upstream sector. Our well-qualified and experienced personnel understand the complexities of the required tasks and know the right tool for the job. As a result, Hydra maintains an industry best safety record with zero lost time incidents (LTIs) and executes projects on budget and on schedule.

 

Location
Region: West Coast U.S.A.
General Project Location: Goleta, California
Facility Type: Heating Terminal

 

Project Details
Services Provided: Vessel and Pipe Cleaning, Drain/Flush/Purge Operation, General Construction and Pipe Removal
Duration of Project: 92 Days
Total Manhours: 15,308
Lost Time Incidents: 0
Crew Size: 15
Crew Disciplines: Project Management, Tank Cleaning Technicians with H2S, Confined Space Entry and Working at Height Certification

 